Repair or Replacement Requiring Permits
Air Conditioning
Boiler/Furnace
Hot Water Heater
Gas Piping
installation 1-5 new electrical fixtures/outlets
Upgrade Electrical Service
Replace Electrical Service
Windows
Propane Tanks
Removal and replacement of any finish material amounting to more than 25% of the structure.
Plan review may take up to 20 business days after Zoning approval if needed. If the documents do not comply, the applicant will be notified of the violations and corrected documents will need to be submitted.
Permits for this type work can be applied for online at https//:www.govonlinesaas.com/nj/oldbridge/public or by filling out the appropriate forms located on this site and bringing in.